Civil, electrical, process and piping engineering for a 509,000-tonne-per-year rebar and spooler micromill.

Project type

Greenfield

New plant

Business line
01 · The project

Development of a new MiDA plant for the production of rebar and rebar coils (spoolers), with an annual output of 509,000 tonnes, including its utilities such as electrical, water treatment, gases and administrative services.

02 · GPI scope

Civil engineering LOD 400

Civil engineering for construction and/or fabrication (LOD 400) for earthworks, roads, paving, deep foundations for buildings and equipment, shallow foundations and equipment superstructures, raceways, steel structure for the EAF and LF service building (Compound), EAF and LF operating platform, pipe and cable tray racks, and miscellaneous items such as platforms, handrails, stairs and hoists.

Electrical engineering LOD 350

Detailed electrical engineering (LOD 350) for all auxiliary services such as lighting, receptacles, HVAC, cranes and UPS, plus the design and engineering of lightning protection, primary and secondary grounding, and the design of the low- and medium-voltage cables required for the facilities. Integration of the technology supplier’s (Danieli) electrical engineering into the project, and design of overhead and underground raceways.

Process engineering

Process engineering for the design and basic engineering of the plant’s Water Treatment Plant.

Piping engineering LOD 350

Detailed piping engineering (LOD 350) for direct and indirect cooling water, chilled water, hydraulic, lubrication, grease, natural gas, oxygen, argon, nitrogen and compressed air services.

03 · Deliverables

Across all disciplines:

  • Calculation reports
  • 3D models
  • Engineering drawings for construction or fabrication
  • Bill of quantities
  • Bills of materials
  • Bolt lists
  • Rebar and formwork detailing
  • Construction specifications
  • Typical installation details
Additionally

Documents that required it were signed by the State BSE.

For a year and a half, a GPI engineer provided on-site support with consulting and communication services.

Key figures

509,000 t/year

Annual plant output

LOD 400

Civil engineering for construction and fabrication

LOD 350

Electrical and piping engineering

1.5 years

Of on-site engineering support

Have a similar project?

Tell us about the scope, plant and schedule.

Gallery

The project in 3D models

Contact

Tell us about your project

We will contact you to understand the scope, plant and schedule.